PROJECTS

city of oceanside

robert a. weese wfp solids handling lagoons

Project consisted of phased construction of three solids handling lagoons, new decant & return washwater pump station, electrical & control upgrades, and site improvements.

Owner: City of Oceanside Water Department

Engineer: Carollo Engineers

Construction Manager: Tetra Tech

Contract Value: $4.7 Million

IEUA

RP-5 Flow Equalization & Effluent Monitoring

Project consisted of upgrades to existing Aeration Splitter Box, Tertiary Chemical Pump & Storage Facility, and Chlorine Contact Basins. 

Work included: 

New chemical feed pumps, piping, electrical upgrades, and 15MGD sewer bypass for installation of flow measurement instruments.

Owner: Inland Empire Utilities Agency

Engineer: LEE & RO, Inc.

Contract Value: $1.1 Million


city of san diego

mbc additional biosolids storage silos

Project consisted of furnishing and installing two (2) additional welded steel storage silos, live bottom screw system, cake pump systems, sludge piping and automated valves, electrical and integration with existing DCS control system.

Owner: City of San Diego Public Works Department

Engineer: AECOM

Construction Manager: City of San Diego

Contract Value: $6.1 Million

St Patrick Catholic Community

parish hall

Phase 1 of St. Patrick Catholic Community's building plan included the construction of a new building to be used for School and Parish activities at their Carlsbad, CA location. SCW was contracted to fabricate and install steel embeds, structural steel roof framing and columns, metal decking, stairs, handrails, and trash gate enclosures. 

wells no. 27 & 28 equipping

jurupa community services district

This is the first ASR (Aquifer Storage & Recovery) project for the district. Through the use of downhole control valves, the district will be able to replenish their groundwater aquifer through their groundwater extraction wells when system demand is low. 

The project consisted of equipping of two (2) groundwater wells with 800hp pumps, VFDs, SCADA integration, standby diesel generators, CMU chemical and electrical building, on-site sodium hypochlorite generating systems, perimeter walls and fencing, and site improvements.

Owner: Jurupa Community Services District

Engineer/Construction Manager: Albert A. Webb & Associates

Contract Value: $7.1 Million

Boffo Cinemas

the Lot liberty station

A centerpoint of the Liberty Station revitalization, the LOT offers a unique and high quality dining and cinema experience. SCW was contracted to fabricate and install structural steel reinforcements to the existing structure, elevated seating platforms, projector and screen supports and framing, handrails, and outdoor canopy.

city of del mar 

21st street sewer pump station replacement

Project consisted of construction of new sewer pump station and demolition of existing facility. Shored excavation, groundwater dewatering and filtration, cast in place concrete wet well and emergency overflow structures, waterproofing, high performance coatings, fusible PVC forcemain, installation of 200hp vertical non-clog sewer pumps, grinder, odor control, standby emergency generator, electrical and SCADA integration, and site improvements.

Owner: City of Del Mar Public Works Department

Engineer: ATKINS (formerly PBS&J)

Construction Manager: City of Del Mar 

Contract Value: $4.3 million

Gensler studio

broadway san diego

SCW was contracted to fabricate structural steel for the new Gensler Architecture Studio in Downtown San Diego. Project included fabrication and installation of stairways, guardrails, and structural steel.